Abergavenny Cycle Group

This is the Cyclescape page for the Abergavenny Cycle Group. It's the place where we discuss practical steps needed to make the roads in and Abergavenny more inviting places for cycling. To get involved create an account on Cyclescape (click on Sign In, at the top right of the screen) and request to join this group.

The main Abergavenny Cycle Group website, with information about social rides, meetings and events, campaigning and how to join is here: http://abergavennycyclegroup.org.uk

  • DfT Policy Paper - Inclusive Transport Strategy

    Created by Matthew // 1 thread

    https://www.gov.uk/government/publications/inclusive-transport-strategy Lots of interesting stuff about inclusive transport regarding trains, buses, cars, public realm, streets and yes a bit about cycling too. Quotes: Shared Space: 8.11 While we consider CIHT and DPTAC’s recommendations and how to take them forward, we are requesting that local authorities pause any shared space schemes incorporating a level surface they are considering, and which are at the design stage. We are also temporarily suspending Local Transport Note 1/11. This pause will allow us to carry out research and produce updated guidance. Objectives regarding Cycling: • Update Local Transport Note 2/08, which sets out the Department’s guidance to local authorities on designing safe and inclusive infrastructure for cyclists, to take account of developments in cycling infrastructure since its publication in 2008 and the responses to the draft AAP consultation and publish a revised version by early 2019; • By 2020, explore the feasibility of amending legislation to recognise the use of cycles as a mobility aid71 in order to increase the number of disabled people cycling.

    Please sign in to vote.
  • A40 between Abergavenny and Crickhowell

    Created by Jack Thurston // 0 threads

    The A40 between Abergavenny and Crickhowell is a narrow, fast trunk road and totally unsuitable to cycling. This is a vital connecting route in the area, between two neighbouring towns. There are sections where it is easily wide enough for a proper, separate 2m wide cycle path, or a wider shared use path with pedestrians. This is a critical issue if the Usk valley is to be made accessible to people riding bikes. More detail on the issue on the ACG website: http://abergavennycyclegroup.org.uk/cycle-route-to-crickhowell/

    Please sign in to vote.
  • Link to Gilwern Velo Park

    Created by Fraser Stephens // 0 threads

    RAISED AT PUBLIC MEETING 10-04-2014 The obvious cycle route to get to Gilwern Velo Park from Abergavenny is to join the canal towpath at Govilon. On arriving in Gilwern, the cyclist is faces with several issues: Poor surface of the canal path along Gilwern Wharf, steep access down from the canal path. No crossing point on Abergavenny road (without cycling all the way into Gilwern) and then a narrow de-restricted lane with steep sides and no verge leading to the turn into the outdoor centre. We would like to see many improvements made to allow safe access as part of the velo park scheme.

    Please sign in to vote.
  • The Missing Link

    Created by Fraser Stephens // 1 thread

    RAISED AT PUBLIC MEETING 10-04-2014 The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.

    Please sign in to vote.
  • Usk foot/cycle Bridge at Llanfoist

    Created by Fraser Stephens // 0 threads

    RAISED AT PUBLIC MEETING 10-04-2014 If the authorities are serious about expanding Llanfoist with new housing and de-trunking the A40 though Abergavenny, then they have to face this problem. A foot/cycle bridge, either just upstream of the existing bridge, or down stream into castle meadows would both be a solution, as would a new road bridge that would allow the old bridge to become single lane. We all know that cost is the big problem here and that some of the options are not going to be possible, but we should campaign for some solution to be found.

    Please sign in to vote.
Spinner Please wait…
Back to top